Since the first building was built at Finlay Park back in 1953 there have been some significant changes to the facilities. There have been some notable additions like:

  • 1953 The main block was extended with the old gym.
  • 1983 The chapel was built
  • 2000 The stable were demolished and replace with the lake cabins
  • 2005 The spa was built
  • 2007 The big gym was built
  • 2014 The village was opened complete with the 3rd pool on site
  • 2021 Two additional fale were assed int the village

But one thing has remained the same – using the buildings and facilities to share Finlay Park’s vision and values with everyone that comes down the hill to Finlay Park.